黄河源水电站工程大坝渗流安全分析 被引量:3

Analysis on dam seepage safety of Huangheyuan hydropower station
下载PDF
导出
摘要 根据黄河源水电站工程的具体情况,通过对两种不同防渗形式的典型断面进行渗流有限元计算分析,全面评价了黄河源水电站工程的渗流安全状况.计算结果表明:整个大坝防渗系统存在缺陷,库内水平防渗与"L"型垂直防渗连接部位未封闭,右岸坝段基础天然防渗条件差、防渗处理不彻底,导致坝后渗漏量大,且已发生渗透破坏,大坝渗透稳定性不满足规范要求.大坝渗流评价为"C"级,建议采取相应加固处理措施,并完善渗流监测设施. According to the specific circumstance of Huangheyuan hydropower project,through the analysis of the two different forms of the typical cross section′s finite element seepage,the seepage safety of Huangheyuan hydropower project is evaluated comprehensively.The results show that there are some defects in the dam seepage system.The joints between horizontal anti-seepage and L-shaped vertical anti-seepage are not closed.The natural seepage condition of the right bank dam basis is poor and anti-seepage treatment is not completely,which lead to large leakage and failure by seepage behind the dam,so the seepage stability of the dam does not meet the regulatory requirements.The grade of dam seepage is C,so appropriate reinforcement measures should be taken and the flow monitoring facilities should be improved too.
出处 《水利水运工程学报》 CSCD 北大核心 2012年第1期62-70,共9页 Hydro-Science and Engineering
基金 十一五国家科技支撑计划资助项目(Gs710001) 南京水利科学研究院青年基金资助项目(Yy710001 Y711002)
关键词 黄河源水电站 水平防渗 垂直防渗 有限元 渗流安全分析 Huangheyuan hydropower station horizontal anti-seepage vertical anti-seepage FEM seepage safety analysis
  • 相关文献

参考文献5

  • 1青海省水利水电勘测设计研究院.玛多县黄河源水电站工程初步设计报告[R].西宁:青海省水利水电勘测设计研究院,1997.
  • 2南京水利科学研究院.青海玛多县黄河源水电站工程蓄水安全鉴定报告[R].南京:南京水利科学研究院,2001.
  • 3黄河源水电站大坝现场安全检查专家组.黄河源水电站大坝现场安全检查报告[R].南京:南京水利科学研究院,2010.
  • 4张乾飞,顾冲时,郭海庆,宋一明,吴耿桐.土石坝渗流确定分析模型研究[J].武汉水利电力大学学报,2000,33(4):5-9. 被引量:18
  • 5钱家欢 殷宗泽.土工原理与计算[M].北京:中国水利水电出版社,2003..

二级参考文献4

  • 1杜延龄,渗流分析的有限元法和电网络法,1992年
  • 2吴中如,水工建筑物安全监控理论及其应用,1990年
  • 3毛昶熙,渗流数值计算与程序应用,1999年
  • 4沈振中,学位论文,1993年

共引文献71

同被引文献21

引证文献3

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部