摘要
北仑发电厂雨水泵房沉井施工过程中,通过应用加筋地基垫层、超高井体分节制作、沉井下沉形式自由转化、涌土治理、加强观测实时纠偏等项技术,提高了施工效率,节约了成本。
During open caisson construction of rainwater pump techniques are adopted, such as reinforced foundation underlayer, free transformation of caisson mode, surging soil treatment and room in Beilun Power Plant project, many super-high caisson fabrication in segment, strengthening of observation for real-time deviation correction, etc., to increase the construction efficiency and save the construction cost.
出处
《建筑技术》
2012年第3期217-219,共3页
Architecture Technology
关键词
沉井制作
沉井下沉
涌土治理
沉井封底
caisson fabrication
caisson dropping
surging soil treatment
caisson bottom sealing