基于精益造船制造资源数据库的研究 被引量:1

The Study of Manufacturing Resource Database Based on Lean Shipbuilding
下载PDF
导出
摘要 针对目前我国正处于深化精益造船模式转变的关键时期,提出建立制造资源数据库,对生产过程中的各种制造资源进行合理配置。利用该数据库,现场计划管理部门可以进行小日程工序计划的编制,提高整体计划的实施效率,使造船流程更加顺畅,为实现精益造船均衡连续准时生产提供切实可行的保证。 Proposed the establishment of manufacturing resource database which to reasonable configuration all kinds of manufacturing resources in the manufacturing process based on the current our country is in the deepening lean shipbuilding mode the key period of change. Using this database, site planning management department can draw up small agenda process planning, improve the overall efficiency of the implementation of the plan,make shipbuilding process more fluent, for realizing lean shipbuilding equilibrium continuous just-in-time production provide practical guarantee.
出处 《造船技术》 2012年第1期52-56,共5页
关键词 精益造船 制造资源 工序计划 负荷测算 Lean shipbuilding Manufacturing resources Process plan Load measurement
  • 相关文献

参考文献5

二级参考文献10

  • 1Cusumano M. A. The Japanese automobile industry:technology and management at Nissan and Toyota[M]. Cambridge, Mass.: Harvard University Press, 1991:31.
  • 2Chida, T. Davies, P. N. The Japanese shipping and shipbuilding industries: a history of their modem growth [M]. London: Athlone Press, 1990: 106.
  • 3Jeffrey K. Liker, Thomas Lamb. What is Lean Ship Construction and Repair [J]. Journal of Ship Production,2002, 18(3): 121.
  • 4Taiichi Ohno. The Toyota production system, beyond large scale production [M]. Productivity Press, Portland,Oregon, 1988.
  • 5Fujimoto, T. The evolution of a manufacturing system at Toyota [M]. N.Y: Oxford University Press, 1999.
  • 6Herroelen W, De Reyck B & Demeuleester E. Resource-constrained project scheduling-a survey of recent development [J]. Computer and Operation Research, 1998, 25 .. 279- 302.
  • 7Bedworth D D, Bailey J E. Integrated Production Control System[M]. John Wiley & Sons, 1982.
  • 8Blazewicz J J, Lenstra J K, Rinnooy Kan A H G. Scheduling projects subject to resource constraints., classification and complexity[J]. Discrete Applied Mathematics, 1983, 5..11-24.
  • 9Morton T E, Pentico D W. Heuristic Scheduling Systems[M]. John Wiley & Sons, Inc. , 1993.
  • 10刘寅东.基于分布式专家系统的造船生产流程建立方法[J].中国造船,2003,44(4):1-4. 被引量:5

共引文献46

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部