期刊文献+

向斜轴部高压力区巷道支护技术的研究与治理 被引量:3

Inclined shaft to high pressure area of roadway support technology research and management
下载PDF
导出
摘要 随着矿井开采深度的增加,特别是在深部靠近向斜轴部的两翼附近,断层构造发育,围岩破碎,地质应力集中,掘进巷道开挖后变形速度快,前掘后修,影响到掘进巷道安全,更无法形成采煤工作面。鄂庄矿通过对深井应力集中区掘进巷道压力与围岩应力的分布机理进行分析,采取了有效的综合防治措施,取得了较好的支护效果。 With the increase of mining depth mine near, especially in deep to the two wings of inclined shaft department, fault structure development near rock broken, geology, stress concentration, roadway excavation deformation tunneling fast speed, Former dug, affect after roadway excavation repair safety, more cannot form the coal face. Hubei xiezhuang coal tunneling through deep roadway of high pressure and stress distribution mechanism of surround- ing rock stress analysis, adopted effective comprehensive prevention and control measures, and acquired better supporting effect.
出处 《山东煤炭科技》 2012年第1期139-140,共2页 Shandong Coal Science and Technology
关键词 高压力区 巷道 支护 high pressure zone roadway
  • 相关文献

同被引文献20

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部