摘要
针对施工过程中如何实现人、料、机的最佳配置进行了探讨,分析了最佳配置的定义,提出应从计划书、施工组织设计、施工进度计划三方面着手,并分别作了具体阐述,以指导实践。
The paper explores how to realize the optimized allocation of the human,the materials,and the machine in the construction process,analyzes the definition of the optimized allocation,and points out the three aspects,including the prospectus,the design for the construction organization,and the construction progress planning,and undertakes the factual illustration,so as to direct the practice.
出处
《山西建筑》
2012年第10期273-274,共2页
Shanxi Architecture
关键词
施工过程
最佳配置
计划书
施工组织设计
施工进度计划
construction process
optimized allocation
prospectus
design of construction organization
planning for construction progress