南疆百里风区桥梁防风施工技术 被引量:3

Wind-resistant Construction Technology of Bridge in 100km Wind Area of South Xinjiang
下载PDF
导出
摘要 结合工程中风区桥梁所处的实际环境,详细介绍了设置防风设施的必要性,包括正常施工所需周期(不考虑大风影响),实际有效施工周期(考虑大风影响),正常施工所需周期与实际有效施工周期比较(考虑大风影响),以及加大投入缩短施工周期的不确定性;探讨了桥梁施工防风指导原则;深入分析了桥梁施工防风方案比选,包括总体方案,高墩施工防风方案(墩高20m以上),中矮墩台施工总体防风方案(20m以内),并对风区防风设施方案进行了总结。 Combined with the real environment where the bridge is in wind area,the author introduces the necessity for setting wind-resistant facilities in detail,including normal construction period(without considering the effect of gale),practical effective construction period(considering the effect of gale),comparison between normal construction period and practical effective construction period(considering the effect of gale),the uncertainty for shortening construction period with increasing investment,discusses the guiding principle of wind-resistant construction in bridge construction.The author deeply analyzes the comparison and selection of wind-resistant scheme in bridge construction,including overall scheme,wind-resistant scheme in high pier construction(pier height over 20m),wind-resistant scheme in middle-low pier construction(pier height below 20m),and summarizes the scheme of wind-resistant facilities in wind area.
作者 林兵
出处 《施工技术》 CAS 北大核心 2012年第3期65-69,共5页 Construction Technology
关键词 桥梁工程 铁路桥梁 防风 施工技术 bridges railroad bridges wind-resistant construction
  • 相关文献

参考文献3

二级参考文献5

共引文献56

同被引文献19

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部