摘要
通过对曝气池的主要设计参数进行复核 ,查出影响曝气池达不到设计处理能力的主要原因是充氧量过低 ,进而对曝气池进行了改造 ,使污水处理能力提高了25% ,出水水质明显改善。
It was found by checking the main design parameters of the aeration pool that insufficient aeration was the main reason why the aeration pool had not reached its design capacity,based on which modification of the aeration pool was made,which increased the wastewater treatment capacity of the aeration pool by 25% and significantly improved the quality of the output water.