溪洛渡水电站竖井液压滑模施工技术研究 被引量:2

Research on Hydraulic Slip-form Construction Technology of Vertical Shaft in Xiluodu Hydropower Station
下载PDF
导出
摘要 以溪洛渡水电站高线混凝土系统骨料竖井衬砌施工为例,阐述大高差、小仓面、薄壁圆形衬砌结构快速施工技术,解决了因施工场地狭小,而施工仓面不易均匀上升及骨料分离现象无法解决的问题,保证了混凝土施工的质量、安全及工程进度。 Taking construction of aggregate vertical shaft lining of high level concrete luixing system in Xiluodu Hydropower Station as an example, this paper illustrates rapid construction techniques characterized by large altitude difference, small coustruction surface and thin-walled circular lining structure. Problems such as narrow construction site, unevenly lift of construction surface and aggregate segregation can be solved so as to guarantee quality of concrete construction and security and progress of the project.
作者 余金水
出处 《水电与新能源》 2012年第2期17-19,共3页 Hydropower and New Energy
关键词 溪洛渡水电站 系统骨料竖井衬砌 液压滑模 施工 Xiluodu Hydropower Station aggregate vertical shaft lining hydraulic slip-form construction
  • 相关文献

参考文献3

  • 1GBJ113-87.液压滑动模板施工技术规范[S].[S].,..
  • 2中华人民共和国国家发展和改革委员会.DL/T5400-2007.水工建筑物滑动模板施工技术规范[S].2007.
  • 3水利电力部水利电力建设总局.水利水电工程施工组织设计手册[M].北京:中国水利水电出版社,1990.

共引文献24

同被引文献12

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部