摘要
文章主要从上海轨道交通13号线车辆的设计方面,从机械匹配和电气匹配两个方面对受电弓和接触网的关系进行分析,以满足弓网之间的良好匹配。
This paper analyzes the relation of pantograph and catenary from mechinery and electrical match about Shanghai Rail Transit Line 13 vehicles,to meet a good match between the pantograph and catenary.
出处
《电力机车与城轨车辆》
2012年第2期23-24,77,共3页
Electric Locomotives & Mass Transit Vehicles
关键词
城轨车辆
弓网关系
机械匹配
电气匹配
mass transit vehicle
relation of pantograph and eatenary
mechinery match
electrical match