摘要
提出了在特高压输电线路超长站距传输过程中,简化中继站规模并将其直接架设于线路铁塔上的设计方案。对该方案的可行性进行了分析,描述了其系统组成、系统模型、现场及模拟测试结果,分析了其经济实用性,为解决电力系统特高压超长距光通信问题提供了一种新思路。
A design scheme was proposed for a small-scale aerial relay station directly located on the tower for ultra-long span transmissions in UHV power lines.This study analyzed the design scheme's feasibility,composition,simulation model,field test results,simulation results and economic practicality,which could provide a new idea for ultra-long optical communication in UHV power systems.
出处
《电力建设》
2012年第4期46-49,共4页
Electric Power Construction
关键词
特高压
电力线路
塔上光通信中继站
UHV
power line
tower-mounted optical communication relay station