期刊文献+

临海超深地下连续墙施工质量控制措施 被引量:1

Control Measures of Construction Quality for Super Deep Underground Continuous Wall at the Coast
下载PDF
导出
摘要 某工程地下连续墙设计为深基坑围护墙和建筑物承重墙两墙合一,该场地毗邻海岸,海水与场地地下水有联系,对地下连续墙防渗性能要求较高。本文针对该工程地质差、地下水位高、地形复杂、地下障碍物多的特点,对地下连续墙施工的难点、质量控制措施及采取的对策进行了论述。 The underground continuous wall of a project combined two functions of the enclosure wall for deep foundation pit and bearing wall for the building together. The site is adjacent to the coast. The sea water and groundwater of the site have relationship of replenishing each other. There is a higher requirement of leakage prevention for the underground continuous wall. The paper discussed the difficult points of underground continuous wall construction, quality control measures and countermeasures considering the poor engineering geological conditions, the higher underground water level, complex topography, multi underground obstructions.
作者 岳伟
出处 《工程质量》 2012年第4期65-68,共4页 Construction Quality
关键词 临海 超深 地下连续墙 质量控制 adjacent to the coast super deep underground continuous wall quality control
  • 相关文献

同被引文献5

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部