4Moore R, Lodwick W.Interval Analysis and Fuzzy Set Theory [J]0Fuzzy Sets and Systems,2003,135(1).
5Nakahara Y, Saaaki M, Gen M.On the Linear Programming Problems with Interval Coefficients [J]. International Journal of Computer Industri Engineering,1992,23.
二级参考文献9
1程明熙.决策理论和方法[M].东北大学出版社、1991,..
2Fengji Gao, Wenying Z. Mulitple Attrilmte Decision Which Power Importance be Incomplete Defined M].MCDM: Theory and Applications, SCI- TECH Information Services. 1995.
3Gao Fengji,MCDM:Theory and Applications,SCI- TECH Information Services,1995年
6Nessah R, Kacem ! . Branch-and-Bound Method fir Minimizing the Weighted Completion time Scheduling Problem on a Single Machine With Release Dates[J].omputers & Operations Research,2012,39 (2).
7Agnetis A, Pascale G, Pacciarelli D. A Lagrangian Approach to Sin- gle-Machine Scheduling Problem With two Competing Aents[J].Jour- nal of Scheduling,2009,(12).
8Lawler E L .A Dynamic Programming Algorithm for Preemptive Scheduling of A Single Machine to Minimize the Number of Late Jobs [J].Annals of Operations Research Volume, 1990,(26).
9Liu B .Uncertainty Theory .2nd ed[M].Berlin:Springer-Verlay,2007.