摘要
介绍了江西省丰城市潘桥水库泄洪洞洞身存在的主要问题和泄洪洞除险加固钢衬施工质量控制措施.
The existing problems of the spillway tunnel of Panqiao Reservoir is introduced.The construction quality control measure of the plate-steel liner of strengthening the spillway tunnel is stated.
出处
《江西水利科技》
2011年第4期275-277,共3页
Jiangxi Hydraulic Science & Technology
关键词
潘桥水库
泄洪洞
钢衬
质量
Panqiao Reservoir
Spillway tunnel
Plate-steel liner
Quality