摘要 介绍了福清核电站常规岛发电机定子吊装方案。该方案使用液压提升装置及配套吊装构架,建立了吊装构架的有限元分析模型进行力学分析。实际应用表明,吊装构架结构紧凑、安全可靠;支柱采用桁架柱与柱脚箱结构,降低了对基础的要求;新型顶推滑移方式平稳、无冲击,安全可靠;钢索式液压提升装置具有起重能力大、结构紧凑和自动闭锁等优点,非常适合发电机定子等设备的吊装工作。 This paper introduced the generator stator hoisting scheme for conventional island generator stator in Fuqing nuclear power plant, which was using hydraulic lifting device and matching hoisting framework, and making mechanical analysis for hoisting framework with finite element analysis model. The results show that hoisting framework has the advantages of compact structure, safety and reliability, the application of truss column and column base box in pillars can reduce the requirement of foundation, and new sliding method of incremental launching is smooth, non-impact, safe and reliable. The steel wire-type hydraulic lifting device has some characteristics, such as large lifting capacity, compact structure and coupler lock, which is very suitable for the hoisting work of generator stators.
出处 《电力建设》 2012年第5期107-110,共4页 Electric Power Construction
关键词 发电机定子 提升 液压提升装置 顶推 吊装构架 generator stator lifting hydraulic lifting device incremental launching hoisting framework
  • 相关文献

参考文献6

二级参考文献5

  • 1刘鸿文.材料力学(第3版)[M].北京:高等教育出版社,1993.113-115,125,139-145.
  • 2成大先.机械设计手册(第3版)[M].北京:化学工业出版社,1997..
  • 3汤毛志主编.起重技术.北京:水利电力出版社,1988
  • 4北京科技大学,东北大学编.工程力学.第1版.北京:高等教育出版社,1997
  • 5刘声扬主编.钢结构.第2版.武汉:武汉工业大学出版社,1995

共引文献730

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部