期刊文献+

大型污水处理厂改扩建工程关键节点的设计 被引量:4

Design of Key Nodes in Reconstruction and Extension Construction Project of Large Sewage Treatment Plant
原文传递
导出
摘要 厦门石渭头污水处理厂一期工程规模为10×104 m3/d,出水水质执行《污水综合排放标准(》GB 8978—1996)的二级标准,规划远期总规模为40×104 m3/d。本次改扩建工程包括扩建10×104 m3/d规模,并完成对一期工程的升级改造。为使改扩建工程出水水质达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级B标准,工程采用了多模式A2/O工艺,并在设计中充分考虑了与一期工程的有机衔接和合理利用。试运行结果表明,工艺设计合理,出水水质稳定达到设计标准。 Abstract: The design capacity of the first-phase project of Xiamen Shiweitou Sewage Treatment Plant was 10×10 ^4m^3/d, and the effluent quality met the second class criteria specified in the Integrated Wastewater Discharge Standard (GB 8978 - 1996). The total long-term capacity is 40 ×10 ^4m^3/d. The reconstruction and extension construction project included the extension of 10 ×10 ^4m^3/d and the upgra- ding and reconstruction of the first-phase project. In order to meet the first level B criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 - 2002 ), the multi-mode A2/O process was adopted, and the combination and utilization of the first-phase project were fully considered. The trial operation results showed that the process was designed reasonably and the ef- fluent quality met the design standard.
作者 彭弘
出处 《中国给水排水》 CAS CSCD 北大核心 2012年第10期36-41,共6页 China Water & Wastewater
关键词 大型污水处理厂 升级改造 总图布置 多模式A2/O工艺 large sewage treatment plant upgrading and reconstruction general plan layout multi-mode A2/O process
  • 相关文献

参考文献2

二级参考文献2

  • 1陆嘉弘.M-UCT法用于市政污水的除磷脱氮[A].全国污水处理除磷脱氮技术研讨会论文集[C].上海:中国木工程学会水工业分会排水专业委员会,2000.
  • 2尹士君,李亚峰.水处理构筑物设计与计算[M].北京:化学工业出版社,2003.

共引文献32

同被引文献63

引证文献4

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部