摘要 由于高、低背压凝汽器抽空气管路采用串联布置方式,高背压凝汽器抽气排挤低压凝汽器抽气,致使低压凝汽器抽气不能达到设计要求,造成真空值和高、低背压凝汽器背压差值偏低,降低了系统的经济性。通过采取相应措施,对双背压凝汽器抽气系统进行了改造,经济效益明显。 The air extraction system of the high back pressure condenser and the low back pressure condenser is series connected, which causes the activity of air extraction of high back pressure condenser restraining the activity of low back pressure condenser. In that case, the activity of air extraction of low back pressure condenser could not reach the design requirements, resulting in the vacuity degree and low back pressure difference and also reducing the system efficiency. In order to solve this problem, we took some measures to improve the air extraction system of the double back pressure condensers. Finally, we achieved great economic benefit.
出处 《神华科技》 2012年第3期57-61,共5页 Shenhua Science and Technology
关键词 双背压凝汽器 抽气系统 端差 真空 改造方案 Double back pressure condensers Air extraction system Terminal difference Vacuum improvement plan
  • 相关文献

参考文献3

  • 1靳智平.电厂汽轮机原理及系统[M]北京:中国电力出版社,2007.
  • 2雍干.1000MW机组抽真空系统优化探讨[J].电力科学与工程,2010,26(11):65-68. 被引量:4
  • 3包劲松.大型汽轮发电机组双背压凝汽器抽真空系统节能改进方案[J]浙江电力实验研究,2010.

共引文献3

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部