新建火电厂设备制造质量检验工程管理 被引量:3

Management of Equipment Manufacturing Quality Inspection for Newly-built Power Plant
原文传递
导出
摘要 为了保障新建火电厂的顺利投运,在基建阶段需要对锅炉、压力容器、压力管道等关键设备的制造质量进行检验,以杜绝含缺陷设备的安装。从工程施工组织与管理的角度出发,提出了新建火电厂设备制造质量检验工程管理的经验;对设备制造质量检验工程中应重视的事项及需要重点检验的环节进行了总结;对超(超)临界机组建设中出现的新问题进行了分析,并提出了预防和改进措施。 In order to guarantee the commissioning of newly-built thermal power plant,it is necessary to prevent defect equipment from being assembled.So the inspection of manufacturing quality for main component such as boiler,pressure vessel and pressure pipeline,is carried out in the building process of thermal power unit.Based on the engineering management of constructing and organizing,the experience on inspection of equipment manufacturing quality is put forward.Matters needing attention in the inspection of equipment manufacturing quality are described.The new problems in construction of supercritical/ultra-supercritical unit are discussed.Furthermore,prevention and improvement measures are proposed.
出处 《电站系统工程》 北大核心 2012年第3期35-37,共3页 Power System Engineering
基金 中国国电集团公司科技开发项目
关键词 火电厂 超(超)临界机组 工程管理 设备制造质量 验收检验 thermal power plant supercritical/ultra-supercritical unit engineering management equipment manufacturing quality acceptance inspection
  • 相关文献

参考文献9

二级参考文献14

  • 1王德新.高压锅炉用无缝钢管涡流自动探伤[J].锅炉技术,1997(1):25-28. 被引量:2
  • 2张梁,吴玉林,刘树红,张乐福.混流式水轮机内部流场的三维空化湍流计算[J].工程热物理学报,2007,28(4):598-600. 被引量:12
  • 3Tijsseling A S. Varcly A E. Fluid-Structure Interaction and Transient Cavitation Tests in a T-Piece Pipe[J]. Journal of Fluids and Structures, 2005, 6 (20): 753-762.
  • 4张贵行,王禹民,黄其励等.电力工程师手册[M].北京:中国电力出版社,2001.
  • 5Bozzini B, Marco E. Evaluation of Erosion-Corrosion in Multiphase Flow Via CFD and Experimental Analysis [J]. Wear, 2003, 255: 237-244.
  • 6Mitsutaka H. Koike. Erosion Corrosion in Stainless Steel Pipe under Water Vapour Two-phase Flow Conditions[J]. Corrosion Science, 2006, 3(48): 617-624.
  • 7Bryan Poulson. Complexities in Predicting Erosion Corrosion [J]. Wear, 1999, 233 (235): 237-244.
  • 8代真,沈士明.高压空气冷却器管束冲蚀破坏的数值模拟及其结构优化[J].核动力工程,2007,28(4):104-107. 被引量:7
  • 9俞文清.投资项目管理学[M].立信会计出版社,1998.86-95.
  • 10.HPE ISO9001质量管理程序文件[Z].,2000.34-38.

共引文献12

同被引文献12

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部