期刊文献+

珠藏洞隧道施工安全监测与评价 被引量:4

Safety Monitoring and Evaluation for Zhuzangdong Tunnel Construction
下载PDF
导出
摘要 为了保证谷城至竹溪高速公路珠藏洞隧道开挖过程中的施工安全,在优化围岩变形的监测方案与预警方法的基础上,对典型监测断面位移量测数据进行了回归分析。分析结果表明,隧道监测断面拱顶沉降和边墙收敛位移累积值均明显小于警戒值,隧道开挖后围岩稳定性较好;隧道围岩变形量和稳定时间与隧道埋深和地质条件密切相关,埋深越大或岩体质量越差,变形越大。 To ensure the construction safety of Zhuzangdong Tunnel in Gucheng-Zhuxi Highway, the monitoring programs and early warning methods for surrounding rock deformation are optimized, and the measured deformation data of typical monitoring sections are analyzed through regression method. The results show that: (a) the accumulated displacement of vault settlement and sidewall convergence are obviously less than safety warning value, and the surrounding rocks are stable after tunnel excavation; (b) the surrounding rock deformation and stability time are closely associated with the tunnel buffed depth and geological conditions, and will be increased with the increase of buffed depth and the degeneration of rock quality.
出处 《水力发电》 北大核心 2012年第6期51-53,共3页 Water Power
基金 水利部公益性行业科研专项项目(201001009) 中央级公益性科研院所基金项目(CKSF2011020/YT)
关键词 安全监测 围岩变形 稳定性分析 珠藏洞隧道 safety monitoring rock deformation stability analysis Zhuzangdong Tunnel
  • 相关文献

参考文献3

二级参考文献27

共引文献154

同被引文献12

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部