大连市三道沟净水厂工程设计 被引量:2

Project Design of Sandaogou Water Treatment Plant in Dalian City
原文传递
导出
摘要 新建大连市三道沟净水厂总设计规模为60×104m3/d,近期(本期)工程设计规模为40×104m3/d,远期设计规模为20×104m3/d。水源主要为碧流河水库水和英纳河水库水。水厂采用管道混合器/小网格反应池/双层平流沉淀池/V型滤池常规处理工艺,出水水质达到了《生活饮用水卫生标准》(GB 5749—2006)的要求。 The total design capacity of Sandaogou Water Treatment Plant is 60 ×10^4m3/d. The capacity of the first-stage (current stage) project is 40 ×10^4m3/d, and the capacity of the second-stage project is 20×10^4m3/d. Major water source of the water treatment plant is from Biliuhe reservoir and Yingnahe reservoir. Conventional technologies of pipeline mixer, small grid reaction tank, double layer horizontal-flow sedimentation tank and V-shaped filter are used. The finished water quality meets the Standards for Drinking Water Quality ( GB 5749 - 2006).
出处 《中国给水排水》 CAS CSCD 北大核心 2012年第12期42-45,共4页 China Water & Wastewater
关键词 管道混合器 小网格反应池 双层平流沉淀池 V型滤池 pipeline mixer small grid reaction tank double layer horizontal-flow sedimenta-tion tank V-shaped filter
  • 相关文献

参考文献2

二级参考文献1

共引文献9

同被引文献5

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部