摘要
杭钢烧结余热回收利用12MW汽轮发电机组采用座浆法垫铁安装工艺进行安装,提高了安装效率和质量,节约了材料并缩短了工期。
In the erection of the 12MW steam turbine generator unit making use of the waste heat from the sintering plant in Hangzhou Iron & Steel Group Company, the shims were installed in the mortar bed method, thereby improving the installation efficiency and quality, reducing the material consumption and shortening the erection time.
出处
《冶金设备管理与维修》
2012年第3期7-8,10,共3页
Metallurgical Equipment Management and Maintenance
关键词
汽轮发电机组
座浆法
二次灌浆
垫铁
Steam turbine generator unit, mortar bed method, secondary grouting, shim