期刊文献+

紧挨500kV高压线的岩土控制爆破实例 被引量:6

A Case of Controlled Rock Blasting Technique in the Rock and Soil near a 500 kV High-tension Line
下载PDF
导出
摘要 输变电线路受风的影响会发生风偏,尤其是在带电运行后,如果满足不了风偏要求就会发生打火现象,甚至会发生接地短路等严重安全事故。结合一个实际施工中的成功经验,介绍了距正在运行的500 kV高压线距离不足6 m处的石方控制爆破技术方案及安全管理措施,以供同类工程参考。 Wind-deviation may occur in transmission lines due to the wind. Especially during the cause of opera- tion, when wind-deviation can not meet the requirements of, the spark phenomenon and even the grounding fault and other serious accidents may occur. Coupled with the successful experience, the technical measures on safety manage- ment of the controlled stonework blasting were introduced, which is less than 6 meters away from the running 500kV high-tension line. The result provides a reference for similar projects and the blasting colleagues.
出处 《爆破》 CSCD 北大核心 2012年第2期47-50,共4页 Blasting
基金 国家自然科学基金资助项目(50874039) 河南省教育厅自然科学基金(2011A580003) 河南理工大学博士基金(B2010-58)
关键词 控制爆破 500 kV高压线 爆破飞石 风偏 安全管理 Controlled blasting 500 kV high-tension line blasting flying rock wind-deviation safety management
  • 相关文献

参考文献7

二级参考文献8

共引文献15

同被引文献28

引证文献6

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部