高桩码头分缝处工后缝宽有限元分析 被引量:2

Finite element analysis of post-construction aperture in high-piled wharf joints
下载PDF
导出
摘要 针对高桩码头伸缩缝处的挤压破损问题,结合实际工程中高桩码头设计方案,运用有限元方法,对码头面板在分缝处发生挤压接触、临界接触和没有接触3种状态进行研究,从理论上分析不同工后缝宽对码头面板内力的影响规律,并提出确定一个合理工后缝宽的新思路,为码头分段设计和施工条件控制提供了依据。 The squeezing damage in expansion joints of high-piled wharf is the general weakness in actual projects,which has a serious impact on the normal use of wharf.To solve this problem,combining the practical engineering design of the high-piled wharf,using the finite element method,we study the aperture comprehensively of three states,i.e.,extrusion contact,critical contact and no contact of the wharf panel,analyze the variation of internal forces of wharf panel with different post-construction apertures theoretically,and propose a new idea on determination of a reasonable post-construction aperture,which provides the basis for the design of wharf segments and construction control.
出处 《水运工程》 北大核心 2012年第6期121-124,134,共5页 Port & Waterway Engineering
关键词 高桩码头 伸缩缝 有限元法 工后缝宽 high-piled wharf expansion joint finite element method post-construction aperture
  • 相关文献

参考文献6

二级参考文献8

  • 1陈忠华,傅翔,王五平,宋人心.高桩码头纵梁裂缝成因分析与对策[J].水运工程,2005(11):40-44. 被引量:5
  • 2JTJ291-98.高桩码头设计与施工规范[S].[S].,..
  • 3JTJ221-98.港口工程质量检验评定标准[S].[S].,..
  • 4郑锋勇,张强.天津港13~15段码头前承台新开伸缩缝性能的观测研究分析[R].天津水运工程勘察设计院,2000年.
  • 5TJ291-98.高桩码头设计与施工规范[S].
  • 6刘卫民.天津港三突堤码头前承台钢轨变形的观测及治理[R].交通部天津水运工程科学研究所,1986年.
  • 7竺存宏主编.天津港水工设施图集[Z].天津:天津港务局,交通部天津水运工程科学研究所,1997.
  • 8张祖贤,朱秀峰,王炳煌.水平力在码头排架中的分配试验研究[J].水运工程,1991(12):13-19. 被引量:13

共引文献13

同被引文献17

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部