期刊文献+

考虑平衡与调度的混流装配线临时工工作时间问题

Balancing and Scheduling Mixed-mode Assembly Line to Minimize Utility Work Time
下载PDF
导出
摘要 提出并研究了直线型混流装配线的平衡调度优化问题,同时从工序分配及产品排序两个方面最小化临时工工作时间。给出了此问题的数学模型,设计了一种基于免疫克隆选择算法的混合策略。算法先单独考虑混流装配线平衡问题,得到工序分配的初始解。再调用局部搜索算法对初始解进行调整,以获得针对特定产品序列的最佳工序分配。eM-PLANT的仿真结果也证明了同时考虑混流装配线的平衡与调度可以得到更低的临时工工作时间。 We minimize the utility work time by considering both task assignment and product sequence. We build the mathematical model and design a hybrid strategy that uses the immune clone selection algorithm. The algorithm considers independently the balancing of the mixed-mode assembly line in order to obtain the initial solution of the task assignment and then applies the local search algorithm to adjust the initial solution and obtain the optimal task assignment for a certain product sequence. Compared with other algorithms, our algorithm is more effective. The simulation results with eM-PLANT show that the simultaneous balancing and scheduling of the mixed-mode assem- bly line can reduce its utility work time.
出处 《机械科学与技术》 CSCD 北大核心 2012年第7期1055-1061,共7页 Mechanical Science and Technology for Aerospace Engineering
基金 霍英东教育基金会青年教师基金项目(111056) 江苏省重大科技成果转化专项项目(BA2007034) 江苏省高校科技成果产业化推进项目(JH07-005) 教育部新世纪优秀人才支持计划项目(NCET-08)资助
关键词 直线型混流装配线 平衡调度 克隆选择算法 EM-PLANT mixed-mode assembly line balancing and scheduling utility work time clone selection algorithm
  • 相关文献

参考文献9

  • 1Kim Y K, Kim S J, Kim J Y. Balancing and sequencing mixed- model U-lines with a co-evolutionary algorithm [ J ]. Production Planning and Control ,2000,11 (S) :754 - 764.
  • 2Mihernburg J. Balancing and scheduling mixed-model U-shaped production lines[ J]. International Journal of Flexible Manu- fac~ring Systems ,2002 ,14 :119 ~ 151.
  • 3Kara Y, Ozcan U, Peker A. Balancing and sequencing mixed- model just-in-time U-lines with multiple objectives[ J ]. Applied Mathematics and Computation,2007,184:566 ~ 588.
  • 4Yano C A, Rachamadugu R. Sequencing to minimize work over- load in assembly lines with product options [ J ]. Management Science, 1991,37:572 - 586.
  • 5Hyun C J, Kim Y, Kim Y K. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines [ J]. Computers and Operations Research, 1998,25 ( 7/8 ) : 675 ~ 690.
  • 6Tavakkoli-Moghaddam R, Rahimi-Vahed A R. Multi-criteria se- quencing problem for a mixed-model assembly line in a JIT pro- duction system[ J ]. Applied Mathematics and Computation, 2006,181:471 ~ 1481.
  • 7Rahimi-Vahed A R, Mirzaei A H. A hybrid multi-objective shuf- fled frog-leaping algorithm for a mixed-model assembly line se- quencing problem [ J ]. Computers and Industrial Engineer- ing,2007,53(4) :642 ~666.
  • 8Sparling D, Mihemburg J. The mixed-model U-line balancing problem[J]. International Journal of Production Research, 1998,36 ( 2 ) :48.5 ~ 501.
  • 9刘冉,楼佩煌,唐敦兵,杨雷.解决U形装配线平衡调度问题的免疫协同进化算法[J].中国机械工程,2010,21(7):815-821. 被引量:6

二级参考文献14

  • 1Mihenburg J, Wijingaard J. The U--line Balancing Problem[J]. Management Science, 1994,40(10): 1378-1388.
  • 2Miltenburg J. Balancing U- lines in a Multiple U line Facility[J]. European Journal of Operational Research,1998,109(1) :1-23.
  • 3Urban T. Note: Optimal Balancing of U- shaped Assembly Lines[J]. Management Science, 1998,44 (5) :738-741.
  • 4Sparling D. Balancing Just- in- time Production Units: the N U--line Balancing Problem[J]. Information Systems and Operational Research, 1998,36 (4) :215-237.
  • 5Milternburg J, Goldstein T. Developing Production Schedules that Balarlce Part Usage and Smooth Production Loads for Just-in time Production Systems[J]. Naval Research Logistics, 1991,38 : 893-910.
  • 6Kubiak W. Minimizing Variation of Production Rates in Just in--time Systems:a Survey[J]. European Journal of Operational Research, 1993,66 (3) : 259-271.
  • 7Kim Y K,Kim S J,Kim J Y. Balancing and Sequencing Mixed--model U--lines with a Co-evolutionary Algorithm [J]. Production Planning and Control,2000,11(8) :754-764.
  • 8Miternburg J. Balancing and Scheduling Mixed- Model U - Shaped Production Lines [J ]. International Journal of Flexible Manufacturing Systems, 2002,14:119-151.
  • 9Kara Y, Ozcan U, Peker A. Balancing and Sequencing Mixed model Just--in--time U lines with Multiple Objectives[J]. Applied Mathematics and Computation, 2007,184 : 566-588.
  • 10Tavakkoli-- Moghaddam R, Rahimi-- Vahed A R. Multi--criteria Sequencing Problem for a Mixed- model Assembly Line in a JIT Production System [J]. Applied Mathematics and Computation, 2006, 181 (2) : 1471-1481.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部