摘要
结合恰希玛核电站C3/C4项目施工实践,对现场混凝土搅拌站的管理经验进行了总结,分别阐述了该项目建造承包商搅拌站在管理制度的落实、配合比、计量设备校验、混凝土运输等方面的管理,指出良好的质量控制在于制度和程序的有效执行。
Combining with the construction practice at C3/C4 program of Kundian Nuclear Power Station,the paper sums up the management experience for the present concrete mixing station,illustrates the implementation of the management system,the measurement equipment checking,the mixing proportion,and the concrete transportation in the constructing contractor's mixing station of the program,and points out the better quality control is decided by the effective implementation of the system and the procedure.
出处
《山西建筑》
2012年第24期277-278,共2页
Shanxi Architecture
关键词
搅拌站
管理
管理制度
配合比
计量设备
mixing station
management
management system
mixing proportion
measurement equipment