摘要
田湾核电厂位于江苏省连云港市东北,距连云港港区约5 km,共建设8台1 000 MV级的核电机组。基于核电厂工程海域近、远期相邻工程的相关规划,综合分析本工程海域的自然条件等主要影响因素,针对核电厂扩建海域取排水工程的可行性和总平面布局方案进行深入研究,并结合相关模型试验的成果,提出工程总平面布置的推荐方案。
Tianwan Nuclear Power Plant is approx. 5 km far from Lianyungang Port Area, North East to Lianyungang city, Jiangsu province, which will be equipped with eight 1 000 MV nuclear power engine sets in total. Based on the planning for short and long term adjacent projects in the engineering sea area of nuclear power plant, we comprehensively analyze natural condition and other major factors of the engineering sea area, study the feasibility and general layout scheme of water intake and drainage expanded project in sea area of nuclear power plant, and finally recommend the general layout scheme by combining with the related model tests result.
出处
《港工技术》
2012年第3期12-14,27,共4页
Port Engineering Technology
关键词
核电厂
取排水
总平面布置方案
温排水试验
泥沙淤积试验
nuclear power plant
water experiment
sedimentation experiment intake and drainage
general layout
warm water drainage