摘要
主要介绍了华电芜湖电厂一期(2×660 MW)工程采用顶管法施工的引水钢管设计、施工方案、施工设备选型等,可供类似工程设计和施工时参考。
Mainly introduces the Huadian Wuhu power plant first phase (2 * 660 MW) works by pipe jacking construction of diversion steel pipeline design, construction scheme, construction quip-ment selection, which can be referred for the similar engineering design and construction reference
出处
《水利科技与经济》
2012年第8期90-92,共3页
Water Conservancy Science and Technology and Economy
关键词
钢管
顶管
引水
设计
施工
steel tube
pipe jacking
water diversion
design
construction