期刊文献+

设置间歇式公交专用道的道路路段通行能力 被引量:6

Capacity of Road Section with Intermittent Bus Lane
下载PDF
导出
摘要 为了计算设置间歇式公交专用道的路段通行能力,在介绍间歇式公交专用道系统的基础上,应用移动瓶颈理论对路段通行能力进行了研究,给出了通行能力的计算公式;然后构建了设置间歇式公交专用道前后双车道元胞自动机交通流模型,对比了公式计算与模型模拟的结果。研究结果表明:通行能力随公交车运营车速的降低而下降;只有当发车间隔大于集结流的集结消散时间时,公交车的发车间隔才会影响路段的通行能力,此时通行能力随发车间隔的增大而增加。 In order to calculate road section capacity with intermittent bus lane(IBL),based on the introduction of IBL system,the capacity was studied with moving bottleneck theory and capacity formulas were presented,and then,a two-lane traffic model with IBL based on cellular automaton was proposed.The capacity calculated and simulated was compared.Research result indicates that: the capacity increases along with bus operation speed;headway affects the capacity only when headway is greater than relaxation time of shockwave;meanwhile,capacity increases with headway.
出处 《交通信息与安全》 2012年第4期34-38,47,共6页 Journal of Transport Information and Safety
基金 国家自然科学基金资助项目(批准号:50978057)资助
关键词 间歇式公交专用道 路段通行能力 移动瓶颈 元胞自动机 intermittent bus lane(IBL) road section capacity moving bottleneck cellular automaton
  • 相关文献

参考文献11

  • 1公安部交通管理科学研究所.GA/T507-2004,公交专用车道设置[S].北京:中国标准出版社,2004.
  • 2Erdman J, Panuska E, Exclusive bus lane experi- ment[J]. Taffic Engineering, 1976,46(7) :28-33.
  • 3胡兴华,刘咏.设置公交专用道道路的交通脆弱性分析[J].交通运输工程与信息学报,2006,4(3):128-133. 被引量:9
  • 4Viegas J, Lu B. The intermittent bus lane signals setting within an area[J]. Transportation Research Part C, 2004(12) :87- 110.
  • 5Viegas J,Lu B. Widening the scope for bus priority with intermittent bus lane[J]. Transportation Plan- ning and Technology,2001(24):87-110.
  • 6Viegas J, Lu B. Bus priority with mtermlttent pus lane[C] // Proceedings of Seminar D, European Transportation Conference, Cambridge, UK, Sep- tember 1999 : 27-29.
  • 7Viegas J, Lu B. Traffic control system with intermit- tent bus lane [C] // in 8th IFAC Symposium on Transportation Systems, Chania, Greece, June 1997 : 16-18.
  • 8Viegas J,Lu B, Vieira J,et al. Demonstration of the intermittent bus lane in lisbon[C]//IFAC Proceed- ings Volumes (IFAC-PapersOnline), 2006,11:239-244.
  • 9Currie G, Lai Herman. Intermittent and dynamic transit lanes., melbourne,Australia, experience[J].Transportation Research Board 2008(2072):49-56.
  • 10Newell G F. Moving bottleneck[J]. Transportation Research Part(B), 1998,32 (8) : 531-537.

二级参考文献1

共引文献9

同被引文献58

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部