摘要
通过深厚覆盖层上耿达水电站闸坝实测持续发展的变位,讨论覆盖层的徐变、覆盖层徐变对工程安全的影响及防止措施。
Through displacement,which is developed continuously,of Gengda Gate dam built on the thick overburden,overburden creep and its affects on project safety as well as measures for the creep prevention are discussed.
出处
《西北水电》
2012年第4期36-40,55,共6页
Northwest Hydropower
关键词
深厚覆盖层
徐变
耿达闸坝
Thick overburden
creep
Gengda Gate Dam