斜拉桥施工过程中的多索力调整 被引量:1

Multi-cable-force Adjustment in a Cable-stayed Bridge During Construction
下载PDF
导出
摘要 在斜拉桥的施工监控过程中,当主梁标高和施工索力出现了偏差,对主梁应力与成桥线形造成不利的影响时,有必要采用斜拉桥施工过程中的多索力调整来消除此误差。本文结合某斜拉桥实例来阐述超重系数的确定、多索力调整的方案制定及索力优化的方法等。 When a great amount of deviation of the elevation of main girders or cable force emerged during construction it would have a bad effect on the stress of main girder and the elevation in completion state of bridge. Therefore, we need to make adjustments to the multi--cable-force of cable--stayed bridge which is under construction. This paper presents the method for identification of the main girder segment weight,, as well as the schemes of multi-cable--force adjusting for this cable-stayed bridge.
作者 张彦伦
出处 《中国科技信息》 2012年第18期68-69,共2页 China Science and Technology Information
关键词 斜拉桥 超重系数 多索力调整 cable-stayed bridge overweight parameter multi- cable-force acjustment
  • 相关文献

参考文献3

二级参考文献11

共引文献216

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部