摘要
对铁路施工企业项目成本控制进行了分析,从权责分解、目标控制、绩效考核三方面介绍了铁路施工企业成本控制的原则,并针对目前铁路施工现场成本管理中存在的问题,探讨了相应措施,以期达到提高铁路施工企业经济效益的目的。
The thesis analyzes the cost control of railway construction enterprise project, introduces the railway construction enterprise cost control principles from three aspects of right-responsibility distribution, target control and achievement assessment, and explores corresponding measures in light of problems existing in cost control in contemporary railway construction site, with a view to improve the economic benefits of railway construction enterprises.
出处
《山西建筑》
2012年第28期240-241,共2页
Shanxi Architecture
关键词
铁路施工企业
成本控制
原则
railway construction enterprise, cost control, principle