关于单桩钢套管人工基床稳定厚度的研究 被引量:5

Stabilized Thickness of Artificial Bedding with Single-pile Steel-casing
下载PDF
导出
摘要 根据宝钢马迹山码头工程大直径嵌岩灌注桩的稳桩实践,采用ANSYS有限元模型模拟施工期间钢套管管径、基床厚度和水平荷载等因素的变化对灌注桩钢套管稳定性的影响,研究探讨人工基床厚度与钢套管管径之间关系,为同类工程设计,施工中确定人工基床的厚度提供参考。 According to the stabilizing practice of large-diameter rock-embedded cast-in-place piles in Baosteel Majishan port project, we adopt ANSYS finite element model to simulate the influence on the steel- casing stability of the driven cast-in-place piles by the diameter of steel-casings, horizontal load and thickness of bedding etc. in construction, research and discuss the relationship between the thickness of artificial bedding and the diameter of steel casings, which will provide the reference for determining the thickness of artificial bedding in similar projects.
出处 《港工技术》 2012年第4期54-57,共4页 Port Engineering Technology
关键词 人工基床 钢套管 基床厚度 等效方法 ANSYS有限元模型 artificial bedding steel-casing thickness of bedding equivalent method ANSYS finite element model
  • 相关文献

参考文献7

  • 1陈德春.宝钢马迹山港扩建工程卸船码头嵌岩桩钢套管稳定性研究报告[R].南京:河海大学,2009.
  • 2JTJ215-98港口工程荷载规范[S].北京:人民交通出版社,2000.
  • 3JTJ213-98,海港水文规范[S].北京:人民交通出版社,1998.
  • 4JTJ213-98港口工程桩基规范[S].北京:人民交通出版社,2000.
  • 5魏华.人工基床单桩钢套管稳定性计算研究[D].南京:河海大学.2011.
  • 6JTJ285-2000港口工程嵌岩桩设计与施工规程[S].北京:人民交通出版社,2000.
  • 7赵晖,陈德春.宝钢马迹山港卸船码头嵌岩桩钢套管的稳定性试验[J].河海大学学报(自然科学版),2008,36(4):563-565. 被引量:11

二级参考文献9

共引文献29

同被引文献24

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部