期刊文献+

虚拟采办全寿命周期管理技术研究及应用 被引量:3

Research and Application on SBA Life-cycle Management Technology
原文传递
导出
摘要 复杂武器装备的虚拟采办是实现人员/组织、管理、技术协同工作的系统工程,其全系统、全寿命周期的各项活动需要管理全方位的支持,针对虚拟采办全寿命周期管理技术开展研究,分析并建立虚拟采办风险评价指标体系,提出基于全寿命周期费用分解结构的费用估计方法,及利用网络图建模及蒙特卡罗仿真方法的全寿命周期进度预测方法。最后,结合某航天复杂装备虚拟采办应用背景,对所提出的管理技术进行应用验证。 SBA of complex weapon is a system engineering, which includes collaboration of personnel/ organization, management and technology. All the activities involved equipment system and of the life-cycle require the support of comprehensive management. Research on management of SBA life-cycle was introduced. An evaluation indicator system was given with the analysis of SBA risk. Based on cost breakdown structure (CBS), a method of cost estimation was proposed. Moreover, a schedule prediction method using arrow diagramming method (ADM) and Monte-Carlo simulation was provided. Finally, with the application on SBA of one aircraft, the methods were demonstrated.
出处 《系统仿真学报》 CAS CSCD 北大核心 2012年第10期2126-2130,共5页 Journal of System Simulation
关键词 虚拟采办 全寿命周期 风险 费用 进度管理 simulation-based acquisition life-cycle risk, cost, schedule management
  • 相关文献

参考文献9

二级参考文献33

  • 1马金平.武器系统渐进式采办与传统采办模式的比较分析[J].北京理工大学学报,2006,26(z1):143-147. 被引量:2
  • 2张国凤.法国武器装备采办制度及特点[J].国防科技工业,2006(7):58-59. 被引量:5
  • 3Danny J.Johnson. A spreadsheet method for calculating work completion time probability distributions of paced or linked assembly lines[J]. International Journal of Production Research, 2002, 40(5): 1131--1153.
  • 4S M T Fatemi Ghomi, E. Teimouri. Path critical index and activity critical index in PERT networks[J]. European Journal of Operational Research, 2002, 141(1): 147-152.
  • 5Premachandra I M.An approximation of the activity duration distribution in PERT[J]. Computers & Operations Research, 2001, 28(5): 443-452.
  • 6Williams T M. Practical use of distributions in network analysis [J ]. Journal of Operation Research Society, 1992 (3):265-270.
  • 7ICK-HYUN NAM. Dynamic schedule for a flexible processing network[J]. Operations Research, 2001, 49(2):305 -315.
  • 8Elmaghraby, Salah E. On criticality and sensitivity in activity networks [J]. European Journal of Operational Research, 2000, 127(2): 220-238.
  • 9张连超.美军高技术项目的管理[M].北京:国防工业出版社,1997..
  • 10DI Yanqiang, LI Bohu, CHAI Xudong, et al. Simulation technology in virtual prototype for complex product[A]. The Proceeding of International Conference on Agile Manufacturing 2003[C]. Beijing, China: China Machine Press, 2003. 303-308.

共引文献126

同被引文献51

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部