汶川地震断裂带科学钻探项目WFSD-2孔防漏固井技术研究与应用 被引量:2

Anti-leakage Cementing Technology with Low Density Slurry in WFSD-2 of Wenchuan Earthquake Fault Scientific Drilling Project
下载PDF
导出
摘要 汶川地震断裂带科学钻探项目二号孔(WFSD-2)钻探施工过程中,地层破碎,坍塌、掉块严重,钻进过程中发生多次井漏。为防止固井过程中发生漏失影响固井质量,采用低密度防漏水泥浆常规单级固井工艺。经过多次水泥浆性能试验,调配出了既具有良好流动性、又具有触变性的低密度纤维防漏水泥浆配方。该低密度纤维防漏水泥浆体系在WFSD-2孔168.3 mm套管固井中施工顺利,应用效果良好。 Due to the broken stratum, wall collapsing, landslide accidents and lost circulation happened frequently in the drilling of the second hole of Wenchuan earthquake fault scientific drilling project ( WFSD - 2). For preventing lost circu- lation during cementing, anti-leakage cementing technology with low density slurry was selected. Through multiple perform- ance experiment of slurry, the formulation of low density slurry for anti-leak was optimized. This formulation was successful- ly adopted to cement the 13168.3 casing in WFSD - 2.
出处 《探矿工程(岩土钻掘工程)》 2012年第9期39-40,44,共3页 Exploration Engineering:Rock & Soil Drilling and Tunneling
基金 科技部科技支撑计划专项"汶川地震断裂带科学钻探(WFSD)"项目之"科学钻探与科学测井"课题
关键词 汶川地震 地震断裂带 科学钻探 低密度水泥浆 防漏 固井 Wenchuan earthquake earthquake fault scientific drilling low-density slurry anti-leakage cementation
  • 相关文献

参考文献8

二级参考文献40

共引文献175

同被引文献11

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部