东升水电站导流墙固结灌浆施工工艺 被引量:1

Consolidation Grouting Construction Technology for Diversion Wall in Dongsheng Hydropower Station
下载PDF
导出
摘要 根据东升水电站导流墙固结灌浆施工实践,总结了固结灌浆过程中钻孔、裂隙冲洗、压水试验、制浆、灌浆、封孔的原则和注意事项。对灌浆过程中所遇到的漏浆及串浆特殊情况,分别采取了待凝及塞住串浆孔的措施,并取得了较好的灌浆效果。 According to the consolidation grouting construction for diversion wall in Dongsheng hydropower station, the pa- per summarizes the principles and precautions of drilling, crack flushing, water pressure test, pulping, grouting and sealing in the process of consolidation grouting. Coagulation and string slurry plugging were taken to deal with slurry leakage and string slurry in the process of grouting construction with good grouting effect.
出处 《探矿工程(岩土钻掘工程)》 2012年第9期71-74,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 东升水电站 固结灌浆 漏浆 串浆 dongsheng hydropower station consolidation grouting slurry leakage string slurry
  • 相关文献

参考文献6

二级参考文献8

  • 1曹雪然.钻灌一体化灌浆工艺的研究与应用.黄河规范设计,2010,(1):18-19.
  • 2王自清.水利水电工程地层注浆堵水与施工新技术及标准规范[M].北京:中国知识出版社,2006.
  • 3刘正峰.地基与基础工程新技术实用手册[M].北京:新潮出版社,2001.
  • 4DL/TSl48-2001,水工建筑物水泥灌浆施工技术规范[S].
  • 5董哲仁.堤防除险加固实用技术[M].北京:水利电力出版社,2004.
  • 6梁炯望.锚固与注浆技术手册[M].北京:中国电力出版社,1999..
  • 7DL/T5148-2001.水工建筑物水泥灌浆施工技术规范[S].[S].,..
  • 8王胜,祝华平,黄润秋,林锋,陈礼仪.锦屏一级水电站煌斑岩脉化学复合灌浆试验研究[J].探矿工程(岩土钻掘工程),2009,36(11):60-64. 被引量:10