文泾水电站泄洪冲沙设计 被引量:1

Design of Spillway Flushing Tunnel for Wenjing Hydropower Station
下载PDF
导出
摘要 文泾水电站位于多泥沙的泾河上,泥沙问题是直接关系到文泾水电站发电效益和安全的重大技术问题。设计采用泄洪冲沙洞作为泄洪排沙建筑物,通过计算分析、模型试验确定冲沙洞相对位置、规模,成功地解决了泥沙淤积问题,保证了电站发挥正常效益。 Wenjing Hydropower Station is located on Jinghe River which is full of silt. Silt problem is a quite serious problem since it' s related to the profit and safety of the hydropower station. In this design, the spillway flushing tunnel was utilized for the flood flush and discharge of the silt. Numerical simulations and experiments were introduced to locate the positions and the scales of the spillway flushing tunnels, which had resolved the problem of the sedimentation. Thus, this program guaranteed the normal operation and profit of the hydropower station.
作者 李少明 蔡富
出处 《人民黄河》 CAS 北大核心 2012年第9期111-114,共4页 Yellow River
关键词 泥沙淤积 冲沙洞 冲沙漏斗 文泾水电站 sedimentation sedimentation erosion upstream funnel Wenjing Hydropower Station
  • 相关文献

参考文献9

二级参考文献10

共引文献9

同被引文献4

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部