期刊文献+

多周期多设备冰蓄冷系统的优化模型、算法及应用

Optimization Model,Algorithm and Application of Multi-period and Multi-equipment Ice Storage System
下载PDF
导出
摘要 本文以多周期多设备冰蓄冷系统运行的动态过程为主要约束,以设备运行状态等为离散优化变量,以设备流体流速等为连续优化变量,以系统运行总费用为目标函数,建立了非线性非光滑的混合整数规划,并论述了该规划问题最优解的存在性。依离散优化变量的有限性,把这个优化问题等价地分解成有限多个关于连续优化变量的线性规划,构造具体的优化算法。最后应用于一个实际冰蓄冷系统,表明了本文的数学模型及优化算法等的正确与有效性,达到缓解用电高峰的用电量,并降低了用户的运行费用。 This paper considers the optimization of an multi-period and multi-equipment ice storage system. Taking the dynamic process of the ice storage system as constraint, a nonlinear and non-smooth mixed integer optimization model is built, with the running state of equipments as discrete variables, the flow rate of fluid in the equipmentsas continuous variables, and the total system running cost of the system as cost function. The existence of solutions to the optimization problem is explored. Due to the finiteness of the admissible set of the dis- crete variables, the optimization problem is equivalently divided into a finite number of sub-optimization prob- lems, which are the form of linear programming with continuous variables to be optimized. An optimization algo- rithm is then constructed. Numerical results are implemented on a factual ice storage system, revealing that both the power consumption in electricity peak and the running cost for user are reduced considerably. So the mathematical model and optimization algorithm is valid.
作者 姜珊 冯恩民
出处 《运筹与管理》 CSSCI CSCD 北大核心 2012年第4期22-28,共7页 Operations Research and Management Science
关键词 冰蓄冷 系统优化 混合整数优化模型 优化算法 ice storage system optimization mixed integer optimization model optimization algorithm
  • 相关文献

参考文献11

二级参考文献16

  • 1王勇.蓄冰系统优化控制研究:[硕士学位论文].北京:清华大学,1997..
  • 2张文星 纪有奎.专家系统原理和设计[M].武汉:武汉大学出版社,1989..
  • 3叶景楼.人工智能、专家系统、程序设计[M].沈阳:辽宁大学出版社,1998..
  • 4.中国大百科全书(光盘版)[M].北京:中国大百科全书出版社,..
  • 5[4]Kawashima M C E,Dorgan J W.Mitchell.Hourly Thermal Load Prediction for the next 24 Hours by ARIMA,EWMA,LR,and An Artificial Neural Network[J].ASHRAE Transactions,1995,101(1):186-200.
  • 6[5]Braun J E.A Comparison of Chiller Priority,Storage Priority and Optimal Control of An Ice Storage System[J].ASHRAE Transactions,1992,98(1):893-902.
  • 7Dorgan C, B,, et al. A descriptive framework for cool storage operating and control strategies[ J ]. ASHRAE Transactions, 2001,107(1) :93-- 101.
  • 8刘修善 等.井眼轨道设计理论与描述方法[M].哈尔滨:黑龙江科学技术出版社,1993.40-70.
  • 9Helmy M W,Khalf F, Darwish T A.Well design using a computer model[R].SPE Drilling&Completion,March 1998.
  • 10Rudolf Randall L.McCann Roger C,Suryanarayana P V R Algorithm and program to plan optimal horizontal well paths[A].Proceeding of the 1998 ASME Energy Sources Technology Conference[C].Feb 2-4 1998.

共引文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部