4Raphael J M.The Optimum Gravity Dam[A].Rapid Construction of Concrete Dams[ C ].ASCE,1970.221-224.
5Londe P.Discussion of Q62[A].Proceedings of 16th ICDLD Congress[C].USA,San Francisco,1988.
6Londe P,lino M F.The faced symmetrical hard-fill dam:a new concept for RCC[J].Water Power & Dam Construction,1992,(1):19-24.
7Londe P,lino M F.The faced symmetrical hard-fill dam[ A ].Proceedings of International Symposium on High EarthRockfill Dams[C].China,Beijing,1993.303-310.
8Toshio Hirose.Design concept of trapezoid-shaped CSG dam[A].Proceedings of the 4th International Symposium on RCC Dams[ C ].Spain,2003.457-464.
9Toshio Hirose.Concept of CSG and its material properties[ A].Proceedings of the 4th International Symposium on RCC Dams[ C ].Spain,2003.465-474.
10Hanada H,Tamezawa T.CSG method using muck excavated from the dam foundation[ A ].Proceedings of the 4th International Symposium on RCC Dams[C].Spain,2003.447-456.