满足各种矿岩配车需求的露天矿车流规划模型 被引量:6

Traffic Flow Programming Model for Various Matchs of Hauling Fleet and Materials in Open-Pit Mine
下载PDF
导出
摘要 将汽车运输露天矿的运输设备与物料匹配关系分为统一运输、独立运输、组合运输3种类型,分析了难度最大的组合运输的车流特点,并充分考虑统一运输、独立运输的兼容性,提出了满足各种矿岩配车需求的通用车流规划数学模型.讨论了模型在3种类型下的应用差别,论述了简化模型计算步骤及提高模型计算速度的办法.实验结果不仅验证了模型的通用性,而且还证明在卸矿点与装岩点或卸岩点与装矿点的距离较近时,矿岩混运具有明显优势,对露天矿车流规划具有评价和指导价值. According to the match of hauling fleet and materials, the truck hauling of open-pit was divided into three types: integrated fleet haulage, independent fleet haulage and combined fleet haulage. The traffic flow characteristics of the most difficultly combined fleet haulage were analyzed, and the compatibility of both integrated fleet haulage and independent fleet haulage was considered, a traffic flow programming model was proposed to meet the various needs of matching material. The difference for the application of three models was discussed, and the computing steps and the method to improve computing speed were explained for the simplified model. The results not only showed the serviceability of the proposed model, but also proved that combined fleet haulage is more superiority in the situation where distance between ore-unloaded place and rock-loaded place or between rock-unloaded place and ore-loaded place is near. The model has practical value for evaluating and guiding traffic flow programming of open-pit mine.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2012年第10期1487-1491,共5页 Journal of Northeastern University(Natural Science)
基金 "十二五"国家科技支撑计划项目(2012BAJ17B01)
关键词 露天矿 车流规划 统一运输 独立运输 组合运输 线性规划 open-pit mine traffic flow programming integrated fleet haulage independent fleet haulage combined fleet haulage linear programming
  • 相关文献

参考文献11

  • 1White J W, Arnold M J, Clevenger J G. Automated open-pit truck dispatching at Tyrone [ J 1. Engineering and Mining Journal, 1982,183(6):76 84.
  • 2White J W, Olson J P. Computer-based dispatching in mines with concurrent operating objectives [ J ]. Mining Engineering, 1986,38(11):1045 1054.
  • 3Sgurev V, Vassilev V, Dokev N, et al. Trasy:an automated system for real-time control of the industrial truck haulage in open-pit mines [ J ]. European Journal of Operational Research, 1989,43:44 52.
  • 4Souza M J F, Coelho I M, Ribas S, et al, A hybrid heuristic algorithm for the open-pit-mining operational planning problem I J ]. European Journal of Operational Research, 2010,207:104l - 1051.
  • 5Ercelebi S G, Bascetin A. Optimization of shovel-truck system for surface mining[ J ]. Journal of the South African Institute of Mining and Metallurgy, 2009,109 (7) : 433 - 439.
  • 6Wang Q, Zhang Y, Chen C, et al. Open-pit mine truck real-time dispatching principle under macroscopic control[Cl // The First International Conference on Innovative Computing, Information and Control. Beijing, 2006:702- 705.
  • 7邢军,孙效玉.基于产量完成度和车流饱和度的露天矿卡车调度方法[J].煤炭学报,2007,32(5):477-480. 被引量:13
  • 8Meerschaert M M. Mathematical modeling[M]. San Diego: Academic Press, 1999:1 60.
  • 9Scharge L. Optimization modeling with LINGO [ M ]. Chicago: LINDO Systems Inc, 2004 : 1 - 151.
  • 10LINDO Systems Inc. LINDO API 5.0 user's manual[ M]. Chicago: LINDO Systems Inc, 2007 : 1 - 480.

二级参考文献5

共引文献21

同被引文献38

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部