期刊文献+

抽油井间抽周期的灰色预测 被引量:8

Grey prediction of intermittent cycle for pumping well
下载PDF
导出
摘要 科学地确定间抽周期是间抽井提高生产效率的重要保证。间抽周期受地层、流体、工作制度等多种因素影响,而且各个因素之间关系复杂,因此有必要把抽油井看成一个系统。根据该系统的特点,文中首先对关井阶段和开井阶段的液面进行监测,然后采用灰色GM(1,1)模型建模,从而确定科学的间抽周期,同时,根据灰色系统理论中的"新信息优先"原理,在生产过程中,用新测试点代替旧测试点,实现了模型的实时调整以及间抽周期的实时预测,最后,以实例证明了该方法方便可行。 In order to enhance the production efficiency of the intermittent pumping well,it is important to determine the reasonable intermittent cycle.The reasonable intermittent cycle is influenced by many factors,such as the reservoir conditions,fluid properties and working system.And all factors influence each other in a complicated way.So the intermittent pumping well can be seen as a system in this paper.According to the characteristics of system,the GM(1,1) model is introduced,which is used to detect the fluid level in shut and flow period respectively.GM(1,1) model is also used to build model in order to determine the reasonable intermittent cycle.At the same time,according to the new information priority principle in the grey system theory,in the process of production,one new test point data will replace one old test point data.The model is adjusted and the intermittent cycle is predicted in real time.At last,an example shows that this method is convenient and feasible.
出处 《断块油气田》 CAS 2012年第5期634-637,共4页 Fault-Block Oil & Gas Field
基金 国家自然科学基金项目"复杂动态网络的优化计算及其应用"(60873021)
关键词 间抽周期 液面高度 灰色系统 GM(1 1)模型 实时预测 intermittent cycle liquid level height grey system GM(1 1) model real-time prediction
  • 相关文献

参考文献14

二级参考文献35

共引文献122

同被引文献59

引证文献8

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部