2IEC. IEC61850 Communication networks and systems in substations [ S ]. Geneva, Switzerland : [ s.n. ], 2005.
3HOSSENLOPP L,CHHATREFOU D,THOLOMIER D,et al. Process bus:experience and impact on future system architectures[C]// Proceeding of CIGRE Session. Paris,France:CIGRE,2008:29-33.
4ANDERSSON L,BRUNNER C,ENGLER F. Substation automation based on IEC 61550 with new process-close technologies[C]//Proceedings of Power Technology Conference. Bologna, Italy : IEEE, 2003 : 132-137.
5ANDERSSON L,BRAND K,BRUNNER C,et al. Reliability investigations for SA communication architectures based on IEC 61850[C]//Proceedings of IEEE St.Petersburg Power Technology Conference. St. Petersburg,Russia:IEEE,2004:512-517.
6SIDHU T S,YUJIE Y. IED modelling for IEC61850 based substation automation system performance simulation [ C ]//IEEE Power Engineering Soeiety General Meeting. Montreal,Canada: IEEE, 2006 : 2871-2879.
7SCHUMACHER M. Process bus communication in high voltage substations based on IEC61850[C]//CIGRE Study Committee B3 Colloquium. Berlin, Germany : CIGRE, 2007 : 134-142.
8APOSTOLOV A. IT application in power system engineering [R]. Scoul, Korea : CIGRE, 2006 : 256-267.
9FERREIRA L R C. Reliability assessment of integrated protection and control systems [ D ]. Manchester, UK : UMIST, 1999:73-76.
10BILLINTON R,ALLAN R N. Reliability evaluation of engineering systems-concepts and techniques[M]. 2nd ed. New York,USA: Plenum Press, 1992:163-165.