期刊文献+

基于瀑布模型的过程和产品质量保证的实施及思考

The Approach and Thinking to the Implementation of Process and Product Quality Assurance Based on Waterfall Model
下载PDF
导出
摘要 过程和产品质量保证(PPQA)是CMMI(CapabilityMaturityModel Integration)实施中较难得到贯彻的过程,结合目前许多单位软件开发普遍采用瀑布模型的现状,该文通过阐述PPQA的活动目标,分析和总结了PPQA的实施方法和成功关键,对企业实施过程的改进具有实际意义。 Process and Product Quality Assurance (PPQA) is difficult to implement during the implementa- tion of CMMI (Capability Maturity Model Integration) and there are most enterprises develops software based on waterfall model.The objectives of PPQA are discussed.The approach and key factors of suc-cessful implementation of PPQA are analyzed and summed up,which have a practical significance to the implementation of process improvement.
出处 《电子质量》 2012年第10期48-52,共5页 Electronics Quality
关键词 质量保证 PPQA 瀑布模型 实施方法 Quality Assurance PPQA(Process and Product Quality Assurance) waterfalt model approach ofsuccessful implementation
  • 相关文献

参考文献3

  • 1[美]埃亨,[美]克洛斯,等.CMMI精粹-集成化过程改进实用导论[M].陈波,译.北京:清华大学出版社,2005.
  • 2刘孟仁.能力成熟度模型(CMM):软件过程改进指南[M].北京:电子工业出版社,2001.
  • 3陈鑫.CMMI在软件外包项目中的实施方法[J].软件,2011,32(6):35-37. 被引量:1

二级参考文献6

  • 1James Persse著.CMMI成功项目管理[M].李晓丽等译.北京:机械工业出版社,2008年.
  • 2Mark C. Paulk, et al. 《Capability Maturity Model for Software (Ver. 1.1)》 [R]. CMU/SEI-93-TR-024, 1993.
  • 3Mark C. Paulk, et al. 《Key Practices of the Capabil- ity Maturity Model (Ver.1.1)》[R]. CMU/SEI-93-TR-02S, Feb, 1993.
  • 4钟汝康.《CMMI如何成为软件外包的“通关牒文”》[EB/OL].(2009-08-07)[2011-09-07].http://kingrk108.blog.163.com/blog/static/323745392009772344724/.
  • 5李兴兵.《SW-CMM模型剪裁中需要注意的问题》[EB/OL].(2007-08-10)[2011-09-07].http://www.soft6.com/tech/3/35890.html.
  • 6李舒磊.《CMM13学习之路》[EB/OL].(2006-11-23)[2011-09-07].http://www.cnblogs.com/kid-li/archive/2006/11/23/570293.html.

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部