摘要 DCS系统的可靠接地是保证DCS安全、可靠运行的重要条件。为了保证DCS系统的监测控制精度和可靠运行,在DCS系统接地设计时,必须严格按照接地相关标准的要求进行设计。本文依据相关标准要求,给出了核电站安全级DCS系统接地设计的原则和方法,并结合辽宁红沿河核电站安全级DCS接地实例作了相关分析。 Reliable grounding is the important conditions tbr DCS system to ensure the safe and reliable operation. In order !o ensure the sge and reliable operation of the DCS system, the DCS system grounding design must fully meet the relevant grounding standm'd requirements. The DCS grounding design principles and methods are given acording to the relevant standards requiremeNls of tho nuclear power plant in this paper, and the safety DCS grounding instance of Liaoning province Hongyanhe nuclear power plant is analyzed
出处 《微型机与应用》 2012年第21期20-22,共3页 Microcomputer & Its Applications
关键词 核电站 安全级 DCS 接地 nuclear power plants safety class DCS grounding
  • 相关文献

参考文献6

  • 1IEEE 1050 IEEE-2004, guide for instrumentation and control equipment grounding in generating stations[S].
  • 2EJ/T1065(1998)核电厂仪表和控制没备的接地和屏敝设计准则【S].
  • 3EJ/T649(1992)核电厂电缆系统设汁及安装准则[S】.
  • 4Q/GLHJ000001-2008,核电厂数亨化仪控系统(DCS)技术要求,北京广利核系统工程有限公司企业标准【S】.
  • 5张冬冬,蒙海军.红沿河核电站站安全级DCS控制系统设汁电力建设【J】.电力建没,2009(6),66-68.
  • 6王常力,罗安.分布式控制系统(DCS)设计与应用实例【M】.北京:机械工业出版社,2010.