摘要
中间柱的稳定性是超深地铁车站盖挖逆作法成败的关键之一,中间柱的沉降监控对结构的安全施工至关重要。以天津站交通枢纽超深基坑工程信息化施工为背景,首次采用静力水准量测技术对超深基坑盖挖法中间柱的沉降与隆起进行了远程自动化监测,并通过对监测数据与实际工程的安全状况进行分析,提出了对中间柱沉隆控制基准值应根据开挖深度及分层开挖阶段进行适当增大的建议,解决了中间柱沉隆的连续远程监测技术难题。
The stability of the intermediate column is the key of cut-and-cover construction of super-deep Metro station. The monitoring of the settlement of the intermediate column plays a very important role in the safe construction of the Metro station. Remote and automatic monitoring is made, by means of hydrostatic leveling technology, on the settlement of the intermediate column of the super-deep foundation pit constructed by cut-and-cover method. The monitoring data and the construction safety are analyzed. Suggestion is made on the control standard of the intermediate column. Contin- uous monitoring of the intermediate column is realized.
出处
《隧道建设》
2012年第5期719-724,共6页
Tunnel Construction
关键词
交通枢纽
超深基坑
中间柱
静力水准
远程实时监测
transportation hub
super-deep foundation pit
intermediate column
hydrostatic leveling
remote and real- time monitoring