摘要
大型氧化铝企业在选择厂外货物运输方式上,面临建铁路转运站或铁路专用线的选择,通过对该课题研究,提出合理的建设方案。
A large-scale alumina enterprise in selecting transportation ways of offsite goods faces two selections of building railway transfer platform or special railway line.Based on research on the above topic,the rational construction scheme has been put forward.
出处
《有色金属设计》
2012年第2期47-50,55,共5页
Nonferrous Metals Design
关键词
铁路转运站
铁路专用线
方案比选
氧化铝厂
Transfer platform
special railway line
scheme comparison
Alumina plant