宝峰隧道下穿既有线铁路隧道施工技术 被引量:7

Tunnel Treasure Peak Tunnel in the Existing Railway Tunnel Construction Technology
下载PDF
导出
摘要 宝峰隧道全长7377m,是昆明至河口铁路昆阳至玉溪段重点控制工程,出口段在D2K17+615处下穿既有昆玉铁路,洞口离既有铁路50m,隧道顶部距离既有铁路路基27m。隧道施工难点为下穿既有铁路施工期间不可影响既有线正常运营,施工难且风险大。本次浅埋隧道穿越既有铁路施工,通过采用合理的施工工法,超前加固,加强初期支护,严格控制沉降,达到了保证既有线路的安全和行车安全,顺利通过下穿既有线段的目的。 Baofeng Tunnel total length is 7377m, it is the one of the key part between Kunyang and Yuxi of the rail- way which is from Kunming to Hekou. The exit zone (D2K17+615) is under-passing the Kunyu Railway, its tun- nel front is 50m far from the railway and 27m high from subgrade of that. It is difficult to build up a tunnel under- pass an existing railway without affecting its normal operation. For ensuring both line safety and traffic safety and achieving the success of this tunnel construction, some key points the author points out as follow. Firstly, doing rein- forcement in advanced. Secondly, have a reasonable construction technique during the whole construction. Thirdly, strengthen primary support. Finally, control the settlement strictly.
作者 张平祥
出处 《广州建筑》 2012年第5期24-28,共5页 GUANGZHOU ARCHITECTURE
关键词 铁路隧道 下穿既有线 施工技术 railway tunnel cross existing railway line construction technology
  • 相关文献

参考文献4

  • 1中国中铁二院工程集团有限公司.宝峰隧道设计文件[R],2010.
  • 2TBl0003-2005,铁路隧道设计规范[s].
  • 3高速铁路隧道工程施工质量验收标准[S].
  • 4B10121-2007铁路隧道监控量测技术规程[S].

共引文献16

同被引文献16

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部