长潭水库大坝自2005年除险加固后经受了"麦莎"等台风洪水的考验,为了评价大坝的防渗效果及安全性能,对加固后的大坝监测资料进行分析,得出了坝体坝基整体渗透稳定性满足规范要求,大坝渗流安全性为"A"级的结论。
The main dam of Changfan Reservoir has withstood many typhoons such as "Maisha" and floods since it was reinforced in 2005. In order to evaluate the anti-seepage effect and safety of main dam, based on analysis of the monitoring data, it is concluded that dam body and foundation seepage stability meet the requirements of specifications on the whole, seepage safety of main dam is at A level.
出处
《广西水利水电》
2012年第6期74-77,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
大坝
渗流
分析
Main dam
seepage
analysis