期刊文献+

船舶改换装工程中船体变形的监测与控制 被引量:2

Monitor and control to hull distortion during ship refitting
下载PDF
导出
摘要 由于船舶改换装工程所涉及的船体工程量较大,如不能很好地加以监测与控制,将可能对船体结构造成较大的变形,从而影响到船舶及装备的性能,因此在施工过程中根据所在企业生产技术条件,制定了合理的工艺方法是必要的。文章对船舶改换装工程中船体变形的控制进行了归纳与分析,在其他船舶的生产实践中,可借鉴参考。 Since a large amount of hull structure work is involved in naval ship refitting, great distortion may happen to hull structure if no proper control and monitor measures are taken, which will subsequently affect the performance of the ship and its equipments, it~ necessary to formulate reasonable technical procedures according to the production and technological conditions of the company during construction process. This article sums up and analyzes distortion control of ship structure during naval ship refitting, which can also be used as lessons and refer- ence in production practice of other naval ships.
作者 李建忠
机构地区 北海舰队装备部
出处 《中国修船》 2013年第1期30-33,共4页 China Shiprepair
关键词 船体结构 焊接变形 变形监测 hull structure welding distortion distortion monitor
  • 相关文献

参考文献2

二级参考文献4

共引文献25

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部