溪洛渡拱坝基础置换块浇筑方式研究 被引量:1

Study on grouting mode of foundation replacement block of Xiluodu arch dam
下载PDF
导出
摘要 拱坝的基础置换处理加固对高拱坝应力的影响和作用非常敏感,在施工期内,高拱坝的整体结构是随大坝不断浇筑增高、封拱和蓄水而逐渐形成的,坝体结构形式在施工过程中承受的自重荷载与温度荷载也不断变化。采用三维有限元软件对溪洛渡拱坝施工期进行了全过程仿真分析,比较了基础置换混凝土的两种浇筑方案对拱坝整个施工期的温度场及温度应力的影响,得到了整个施工过程中拱坝温度场及温度应力变化的一般规律,为控制混凝土拱坝的温度应力和进一步研究拱坝施工期的力学性质提供了理论依据。 The stress and deformation of a high arch dam are very sensitive to foundation replacement treatment. During the construction period, the high arch dam's whole structure is formed gradually with successive dam concrete pouring, arch sealing and water storage, and the self - load and temperature load of dam structure changes continuously. The whole process of Xiluodu arch dam construction is simulated and analyzed by 3 - D finite element software, and the influence of 2 grouting modes of foun- dation replacement blocks on temperature field and temperature stress is compared and the general laws of temperature field and temperature stress variation of arch dam during the construction period are obtained. The study results provide theoretic basis for controlling the temperature stress and further research on stress condition of arch dam during construction period.
作者 杨志刚
出处 《人民长江》 北大核心 2013年第1期57-60,93,共5页 Yangtze River
基金 国家自然科学基金项目(50909049) 江西省教育厅科技项目(GJJ11341) 江西省水利厅科技项目(KT201106)
关键词 施工期 加载过程 温度场 有限元仿真 拱坝 溪洛渡电站中图法 construction period loading process temperature field limited element simulation arc dam Xiluodu Hydropower Station
  • 相关文献

参考文献10

二级参考文献17

  • 1朱伯芳.大型混凝土温度场控制[M].北京:水利电力出版社,1994..
  • 2朱伯芳,水利水电技术,1986年,5期
  • 3朱伯芳,水利学报,1985年,4期
  • 4朱伯芳,水工混凝土结构的温度应力与温度控制,1976年
  • 5朱伯芳,水利学报,1957年,4期
  • 6刘观标,水利学报,1992年,5期,71页
  • 7张富德,清华大学学报,1991年,31卷,5期,1页
  • 8陈式慧,水力发电学报,1989年,3卷,45页
  • 9朱伯芳,大型混凝土温度场控制,1994年
  • 10朱伯芳.大体积混凝土温度应力与温度控制[M].北京:中国电力出版社,1998.

共引文献179

同被引文献5

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部