期刊文献+

水库异重流和浑水水库排沙数值模拟技术研究

Numerical Simulation Technology Research on Density Current and Desilting in Muddy Water Reservoir
下载PDF
导出
摘要 为解决原有库区一维数学模型异重流计算结果不很合理的问题,在一维模型中引入了孔口出流的概念,对浑水水库库区进行了分层计算,并探讨了小浪底浑水水库排沙的计算原理和计算方法。实例计算结果表明,采用该方法得出的出库含沙量过程基本合理。 In order to solve the problem that the density current results of the reservoir area calculated by one dimensional mathematical model was not very reasonable, orifice flow was introduced in the mathematical model and layered calculation was used for muddy water reservoir. The princi- ples and calculation methods of desilting were discussed in Xiaolangdi muddy water reservoir. The ease results show that the out flow process of sed- iment concentration in the reservoir by this method in the paper is reasonable.
出处 《人民黄河》 北大核心 2012年第12期30-31,共2页 Yellow River
基金 水利部公益性行业科研专项(200701044,200901017)
关键词 数值模拟 异重流 排沙 浑水水库 小浪底水库 numerical simulation density current desihing muddy water reservoir Xiaolangdi Reservoir
  • 相关文献

参考文献2

  • 1韩其为.水库淤积[M]北京:科学出版社,2003.
  • 2张瑞瑾.河流泥沙动力学[M]北京:中国水利水电出版社,1998.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部