期刊文献+

Job-shop提前/拖期调度问题的研究 被引量:11

Earliness/Tardiness Job—shop Scheduling Problem
下载PDF
导出
摘要 基于模糊控制和遗传算法 ,提出了求解 Job- shop提前 /拖期问题的联合算法。用遗传算法确定可行调度序列 ,然后用模糊控制器对开工时间加以调整。模糊控制的引入为有效地求解 Job- shop提前 /拖期调度问题提供了新方法。 Based on genetic algorithm and fuzzy control theory, a united algorithm for solving E/T scheduling problem is presented. This genetic algorithm is used to determine feasible scheduling sequence and fuzzy controller is adopted to adjust the leading time. A new method is proposed to study scheduling problem. The numerical result obtained proves the correctness and effcience of the united algorithm.
出处 《控制与决策》 EI CSCD 北大核心 2000年第3期322-324,332,共4页 Control and Decision
关键词 JOB-SHOP调度问题 提前/拖期调度问题 算法 earliness/tardiness scheduling, job-shop, genetic algorithms, fuzzy control, united algorithm
  • 相关文献

参考文献3

  • 1金希东,李治.进化算法及其改进[J].西南交通大学学报,1996,31(2):138-144. 被引量:2
  • 2Yao Weili,Proc of Int Conf on Managem ent Science & Engi-neering,1998年,303页
  • 3姚伟力,中国系统工程与管理科学年会论文集,1998年,55页

共引文献1

同被引文献86

引证文献11

二级引证文献96

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部